◆ Bathroom template · Starter and up

Bathroom renovation estimates with the tile already measured.

Bathrooms are small rooms with expensive surfaces. Estiquik's bathroom template lists the 26 lines a full renovation needs — floor and wall tile by the square foot, waterproofing, the fixtures, the trades — at starting prices for your province or state, with an optional powder room for the jobs that come in pairs.

No card to start 26 priced lines, all editable CAD or USD, tax by region
An Estiquik bathroom renovation estimate open in the app, with priced line items and the totals panel
Sample estimate from the live demo
Twenty-six lines, two rooms

What is on the bathroom template

Every line below arrives with a starting price scaled to your province or state. Quantities are the template's defaults — you change them to the job. Prices are deliberately not shown here, because yours will differ from ours and the point is that they are editable.

Bathroom18 lines

Line itemCategoryDefault quantity
Floor tileMaterials45 sq ft
Wall / shower tileMaterials90 sq ft
Waterproofing membraneMaterials1 lot
PaintMaterials1 lot
Vanity + topFixtures1 ea
Vanity faucetFixtures1 ea
ToiletFixtures1 ea
Tub or shower baseFixtures1 ea
Shower glass doorFixtures1 ea
Shower valve + trim kitFixtures1 set
Exhaust fanFixtures1 ea
Mirror / medicine cabinetFixtures1 ea
Vanity lightFixtures1 ea
Accessories (towel bar, hooks, TP)Fixtures1 set
Demolition + disposalLabour1 lot
Tile installLabour135 sq ft
PlumbingLabour1 lot
ElectricalLabour1 lot

Powder Room (optional)8 lines

Line itemCategoryDefault quantity
Floor tileMaterials20 sq ft
Paint / wallpaperMaterials1 lot
Vanity + sinkFixtures1 ea
FaucetFixtures1 ea
ToiletFixtures1 ea
Mirror + lightFixtures1 lot
Exhaust fanFixtures1 ea
Labour (all trades)Labour1 lot

Line items as shipped in Estiquik's Bathroom Renovation template on 7 September 2026. Contingency defaults to 15% on this template; markup and tax are yours. How the whole estimate is built.

How the price is built

Starting prices, your corrections, your markup

The bathroom template ships with 26 line items across a full bathroom and an optional powder room: tile and waterproofing by the square foot, the tub or shower, vanity, toilet, faucet and accessories as fixtures, the exhaust fan and lighting, and demolition, plumbing, electrical and tiling as trades. Each carries a quantity, a unit and a researched starting price.

Prices are scaled by a regional index for your province or state and every one is editable; your corrections become your baseline. Contingency defaults to 15%, because what is behind the old tile is the most expensive unknown in residential work.

Contingency is applied to cost first, then your markup, then the tax for your region — GST, HST or PST by province, state tax in the US. The markup calculator shows what any markup really keeps as margin, and contingency vs markup explains why they are separate lines.

If there is a drawing

Take the quantities off the plan

Attach the PDF or a photo, set the scale, and the plan takeoff sends measured quantities to these lines with the prices left for you. For this job type, the measurements that matter:

Floor tile

the room to the finished faces, less the tub footprint if it stays.

Wall tile

wall run × height for the wet walls; a shower to the ceiling, a tub surround to the height you agreed.

Waterproofing

the same wet-wall area plus the floor of a shower; the template prices it separately so it is never forgotten.

Fixtures and devices

counted, not measured — a takeoff count item per vanity light, GFCI and exhaust fan.

After the number

From estimate to paid, without retyping

Send

Email it with an Approve button

Or a signing link. The client signs from their phone; name, time and document fingerprint are recorded. Follow-ups go out automatically on Pro.

Contract

Draft the contract from the estimate

Scope, payment schedule with deposit, draws and holdback, change-order clause. E-signed and filed with the job.

Changes

Change orders, priced and signed

The extra pot lights, the upgraded tile. Each one rolls into a revised contract value, so the final invoice is never a surprise.

Paid

Invoice each stage in a click

Deposit, draws and completion from the schedule on the estimate, with a Pay by card button through your own Stripe and e-Transfers recorded.

Before you ask

Questions contractors ask

How much does a bathroom renovation cost to estimate with this?

No single number, on purpose. The template lists the 26 lines a full bathroom needs at starting prices for your region; your quantities and corrected prices make the total. One real bathroom priced in it is a better guide than any published range.

Does it handle a shower conversion or a tub-to-shower?

Yes. The tub and shower are separate fixture lines; delete the one you are not installing, adjust the tile and waterproofing quantities, and add a glass door line if there is one.

What about the powder room?

It is an optional second room on the template with its own short list — vanity, toilet, faucet, tile, paint, plumbing — for the jobs that come with a half-bath on the main floor.

Can I set fixtures as allowances?

Yes. Any line can be marked as a client allowance so the estimate says what is included and the client pays the difference above it.

Which plan is the bathroom template on?

Starter and up, at $19.99 (CA$24.99). Plan takeoff for the tile is on Pro.

The other templates

Priced templates for the rest of the house

Also on every account: a blank custom sheet for anything else. Prefer a spreadsheet? The free estimate template.

Price the next one from the template

Fourteen days of every template, e-signature and invoicing, no card. The Free plan keeps three estimates from a blank sheet after that.

Start free — no card required
14-day trial · Cancel anytime